congratulations to xinglu technology for participating in the supply of the xinjiang wukui expresswa-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the xinjiang wukui expresswa

时间:2019/6/11 10:23:29 浏览:126次
the ukui reconstruction and expansion project starts at the xishan interchange in urumqi, passing urumqi, changji, manas, shihezi, shawan, kuitun, and ends at the west bank of kuitun river bridge and the built lianhuo expressway (g30) from wusu to sailim the starting point of the lake expressway is smoothly connected, with a total length of 242 kilometers, changing from a two-way four-lane to a two-way eight-lane. the modification and expansion method is "splicing and widening on both sides". it is estimated that the total investment will exceed 13.3 billion yuan, and it is planned to be completed in october 2019. each bidding section needs to be confident, motivated, race against time, with a good mental state, go all out, ensure quality and quantity, complete various construction tasks in a safe and efficient manner, and perform due diligence to promote the construction of the g30 ukui reconstruction and expansion project.
previous:
next: