xinglu technology participated in the mechanical and electrical engineering project of the g30 urumq-捕鱼游戏

news

news

xinglu technology participated in the mechanical and electrical engineering project of the g30 urumq

时间:2019/4/18 10:19:40 浏览:124次
the project starts from the ganquanpu industrial park, connects to the tuwu-dalian expressway (ganquanpu interchange), passes through urumqi east, and ends at the tuwu-dalian expressway-wulabo interchange. the total length of the route is about 79.53 kilometers, and the design speed is 100 km/h. , the highway is classified as expressway. there are 2 tunnels in this project, the shirenzigou tunnel is 420m long, and the gejiagou tunnel is 1452.5m long, both of which are laid separately.
this project has 1 management sub-center (located at the interchange of guanyuan road and jointly built with guanyuan road toll station), 2 service areas, 2 maintenance work areas, 7 ramp toll stations (midong, tiechanggou, gansu) gou, shirenzigou, guanyuan road, yan'an road, wulabo), 2 main line toll stations (ganquanpu, wulabo).
previous:
next: