congratulations to xinglu technology for participating in the supply of the electromechanical engine-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the electromechanical engine

时间:2017/10/3 17:24:42 浏览:126次
the starting point of the project is located at the south exit of zhalantun city, connecting xinlinbei to zhalantun expressway, and then passing eastward through gaotaizi village, jiangjialinggang, and sancun. the dahewan interchange is set up near sancun, and then the route crosses yinhe , passing through the zhalantun-arongqi railway, passing through luodiyingzi, shengli, xiangyangyu, and setting up the arongqi south hub interchange near jiefangtun to connect with the suiman expressway (g10), and then reaching the zero kilometers of the inter-provincial corridor, the end point take the g111 arong banner to nierji section of highway. the total length of the route is 54.7 kilometers. the whole line adopts two-way four-lane expressway standard construction, the subgrade width is 25.5 meters, and the design speed is 100km/h.
     there are a total of 293.2m/2 bridges, 295.59m/6 middle bridges, 176m/8 small bridges, and 67 culverts. two interchanges will be set up at dahewan and the south of arongqi, and one interchange will be reserved at xiangyangyu. there are 2 ramp toll stations, 1 service area, 1 parking area, and 1 maintenance work area (co-built with the ramp toll station).
previous:
next: