congratulations to xinglu technology for participating in the supply of the "ph-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the "ph-jd5 bid section" pro

时间:2017/7/28 17:16:55 浏览:131次
the main line of the project is 88.172km in length. the starting point of the route is 8.5 kilometers north of pingkan town, fengxian county, baoji city. it is connected to the baoji-pingkan expressway along the dinghan line, and goes south along the xihe river through pingkan town and shiziba to liuba jiangxiying village, jiangkou town, county, and then along the baohe river to the south, passing wuguanyi town (jianwozi), madao town to qingqiaopu village, qingqiaoyi township, set up an extra-long tunnel to avoid shimen baohe reservoir area, in pingan village on the north side, the shimen reservoir extra-large bridge spans the reservoir, and the lianchengshan extra-long tunnel is located near jinzhai village, baocheng town, mian county, the end of the route. the designed driving speed is 80km/h and the roadbed width is 32m. the estimated investment of the project is 14.789 billion yuan
previous:
next: