congratulations to xinglu technology for participating in the supply of the project for the reconstr-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the project for the reconstr

时间:2017/5/27 17:10:53 浏览:127次
the project starts at the south side of cuimu town and connects to line 306, bypasses cuimu town to the east, and connects to the existing s306 line at k1 100. then the old road is used to cut the bend and straighten it, passing shuiquan bay, damai digounao, qili, tongshuwan, langhuwan, panjialiang, ending at linyou yongshoujie, connecting with the existing s306 line, the total length of the route is 12.326 kilometers, and the construction investment is 61.81 million yuan.
previous:
next: