our company participated in the etc lane reconstruction project of xi'an north toll station of xi'an-捕鱼游戏

news

news

our company participated in the etc lane reconstruction project of xi'an north toll station of xi'an

时间:2017/3/29 16:59:41 浏览:158次
the route of the project starts from the lvxiaozhai interchange of xi’an ring expressway, passes through weiyang district, gaoling, jingyang, sanyuan to tongchuan new district from south to north, and connects to the proposed tongchuan-huangling expressway. tonglu road and baoxi railway are in parallel, with a total length of 62.031km (synchronous implementation of jingyang interchange connection line 4.29km, sanyuan interchange connection line 3.5km, zhuangli connection line 20.62km, weihe-guanzhong ring line accessory road 29.009km), and the preliminary design estimate is 79.75 100 million yuan. the starting point to jingyang interchange is 20.019km, adopting two-way eight-lane expressway technical standards, design speed 120km/h, roadbed width 41.0m; jingyang interchange to tongchuan new district interchange section 40.595km, adopting two-way six-lane expressway technical standards, design speed 120km /h, the width of the roadbed is 34.5m; the interchange of tongchuan new district to the end point is 1.386km, adopting the two-way six-lane expressway standard, the design speed is 100km/h, and the roadbed width is 33.5m.
previous:
next: