highway project from jintan district to yixing-捕鱼游戏

news

news

highway project from jintan district to yixing

时间:2020/12/26 17:08:54 浏览:99次
the jintan district-yixing expressway is a newly added expressway in the "expressways of jiangsu network planning (2017 something 2035) " . it is an important part of the "vertical three" in the "15-shot, 6-vertical and 10-horizontal" expressway network planned in jiangsu province, no. "s45" , the project starts from changli expressway, the starting point is between changdang lake interchange and rulin interchange on changli expressway, 2.4 km from rulin interchange and 3.7 km from changdang lake interchange, then it intersects the planned s239 route, reserving the conditions for the branch line to span, after crossing it from the west side of the newly built town, it uses the xinfang town to reserve the corridor of the high-speed passage, and then it spans the planned s341, heading south from the west side of dushandang, and crossing nanxi river and g104 on the west side of xushe town, under the ning-hang high-speed rail, using ramp standards on the cross-ning hangzhou expressway after the s263, the total length of 29.117 km (including 2.612 km in jintan district, 26.488 km in yixing) .
previous:
next: