congratulations to our company for participating in the supply of the baisha express exit road proje-捕鱼游戏

news

news

congratulations to our company for participating in the supply of the baisha express exit road proje

时间:2020/10/9 17:05:25 浏览:235次
the baisha express exit road has a total length of 36km, with 4 tunnels on the whole line, including 1 long tunnel, 2 medium tunnels and 1 short tunnel. there are 4 interchanges across the line and 1 service area (fulong service area) (the baishishan tunnel tube station and the service area are combined). the mechanical and electrical engineering content includes road section monitoring system, communication system, station area power supply and lighting, tunnel mechanical and electrical engineering (tunnel monitoring, ventilation, fire protection, power supply and lighting system). set up 1 box-type substation and 1 charging pile box-type substation in the fulong service area; a total of 4 tunnel civil construction substations and 1 tunnel box-type substation are set up across the line; the road section monitoring field is included in the management of baishishan tunnel management station. the tunnel management station will uniformly upload the road section and tunnel information to the western management and distribution center located in the wanyang expressway ** interchange.
previous:
next: