congratulations to xinglu technology for participating in the supply of the new reconstruction proje-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the new reconstruction proje

时间:2020/8/19 11:18:17 浏览:251次
national highway 318 lhasa-xigaze airport section highway new reconstruction project (controlled engineering) lhasa-chabala section with a total length of 41 kilometers; dazhuka to shigatse airport section with a total length of 34.868 kilometers. the main line of the bidding project adopts two-way four-lane expressway technical standards, with a design speed of 100 km/h and a roadbed width of 25 meters. the vehicle load level of the entire line adopts highway-i. other technical indicators are in accordance with the "highway engineering technical standards" issued by the ministry of transport. "(jtg b01-2014) implementation.
previous:
next: