congratulations to xinglu technology for participating in the supply of the electrical and mechanica-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the electrical and mechanica

时间:2020/7/10 11:13:45 浏览:191次
the total length of the taibai-fengxian expressway (hereinafter referred to as "this project") is 85.614 kilometers. the section from tianba to fengxian (shanxi-gansu boundary) of this project starts in tianba village, pingmu town, fengxian county, and connects with the tf-01 contract section of the project's design and construction general contract and yinkun expressway (g85) at the tianba interchange. yangdian, which ends at the boundary of shaanxi-gansu, is connected to the starting point of the gansu ten-day expressway liangdang link under construction. the total length of the route is 54.454 kilometers. the entire line adopts two-way four-lane expressway technical standards, and the design speed is 80 kilometers per hour. the width is 25.5 meters, and other technical indicators shall be implemented in accordance with the "technical standards for highway engineering" (jtgb01-2014) issued by the ministry. total project investment: 9.3 billion yuan
previous:
next: