congratulations to xinglu technology for participating in the supply of the mechanical and electrica-捕鱼游戏

news

news

congratulations to xinglu technology for participating in the supply of the mechanical and electrica

时间:2020/5/30 11:07:04 浏览:173次
the baitao tunnel project was undertaken by china nuclear power northwest construction group co., ltd., with a total length of 11.09 kilometers. it starts from hexiang village, lizhi street, nanfu expressway, and ends at the second wujiang bridge planned in fuling district. the expressway project has a designed road width of 24.5 meters, two-way four-lane, a design speed of 80 kilometers per hour, and a total of three tunnels, including two extra-long tunnels. the tunnel length accounts for about 81% of the total length. at present, all three tunnels have been penetrated. the civil construction is basically completed, and the bridge substructure is fully completed. the main construction content of the remaining works of the baitao tunnel includes water-stable layer, asphalt pavement, secondary lining in the tunnel, paving of the remaining part of the bridge project, as well as mechanical and electrical installation, traffic safety engineering, toll system, management center housing construction, charging ceilings, greening projects, etc.
previous:
next: