news
news
the main line of the project is 88.172km in length. the starting point of the route is 8.5 kilometers north of pingkan town, fengxian county, baoji city. it is connected to the baoji-pingkan expresswa
发布时间:2017/9/23the main line of the project is 88.172km in length. the starting point of the route is 8.5 kilometers north of pingkan town, fengxian county, baoji city. it is connected to the baoji-pingkan expresswa
发布时间:2017/9/12the main line of the project is 88.172km in length. the starting point of the route is 8.5 kilometers north of pingkan town, fengxian county, baoji city. it is connected to the baoji-pingkan expresswa
发布时间:2017/7/28the main line of the project is 88.172km in length. the starting point of the route is 8.5 kilometers north of pingkan town, fengxian county, baoji city. it is connected to the baoji-pingkan expresswa
发布时间:2017/7/20the dongxi river bridge crosses the dongxi river valley and 520 county road. the 520 county road is a fourth-class road with a standard roadbed width of 6.5 meters. it is the only road leading to yuli
发布时间:2020/8/5as one of the ten major city-building projects in zhangjiakou city, zhangshi expressway is the only main traffic arterial line connecting the bashang and baxia areas of zhangjiakou city.
发布时间:2017/7/12